You don't have javascript enabled. Good luck with that.
Pencarian
 Perbaikan 4 Turap di Kelapa Gading Rampung

Four Retaining Walls Repair in Kelapa Gading Finished

Four retaining walls of rivers and connecting (PHB) channels in Kelapa Gading, North Jakarta, have been repaired. It is faster than the target which is by the end of April.  

We repair it by rebuilding the broken parts

Kelapa Gading Sub-district Water Resources (SDA) Unit Head, Rukmana said, retaining walls need to be repaired because of decline in the construction and some parts are crumbling.

Sunter Lake Retaining Wall Has Been Repaired

"We repair it by rebuilding the broken parts. Especially with elevating Sunter River's retaining wall to anticipate water from overflowing," he explained, Thursday (3/22).

He mentioned, Janur Elok PHB channel at RW 06 Kelapa Gading Barat is repaired along 59 meters with 3 meters high, Janur Elok PHB channel at RW 11 Kelapa Gading Barat is repaired along 161 meters with 2.5 meters high.

Then, Pelepah Indah PHB channel retaining wall at RW 18 Kelapa Gading Timur is repaired along 92 meters and 3.5 meters high, Sunter River retaining wall at RW 04 Kelurahan Kelapa Gading Barat is repaired along 325 meters with 0.70 meters high.

"Now, Sunter retaining wall is elevated into 1.5 meters high," he conveyed.

Linked News
Popular News indeks
  1. Pramono Affirms Commitment to Enhancing Regional Financial Management Quality

    access_time02-04-2026 remove_red_eye793 personTiyo Surya Sakti
  2. Pramono Calls for Enhanced Synergy at DPRD Post-Eid Gathering

    access_time30-03-2026 remove_red_eye702 personDessy Suciati
  3. Banners Prohibiting Illegal Parking Levies Installed at Blok M Square

    access_time02-04-2026 remove_red_eye639 personTiyo Surya Sakti
  4. Kampung Rambutan Terminal Sees Increase in Intercity Bus Passengers

    access_time03-04-2026 remove_red_eye576 personNurito
  5. Gov Pramono: Jakarta Prepared to Adopt Weekly WFH Scheme

    access_time30-03-2026 remove_red_eye447 personDessy Suciati